Feldspar Mill precautions

Feldspar Mill operation precautions

1. In order to make the Feldspar Mill normal, the equipment "equipment maintenance and safety operation system" should be established to ensure the long-term safe operation of the Feldspar Mill, and necessary maintenance tools as well as grease and corresponding accessories.

2. When the grinding roller device of the Feldspar Mill is used for more than 500 hours to replace the grinding roller, the rolling bearings in the roller sleeve must be cleaned, and the damaged parts should be replaced in time. The fueling tool can be manually pumped and greased.

3. During the use of the Feldspar Mill, there should be fixed personnel responsible for the care, the operator must have a certain level of technology. The Feldspar Mill must perform the necessary technical training for the operator before installation to understand the principle performance of the Feldspar Mill and familiar with the operating procedures.

4. After using the Feldspar Mill for a period of time, it should be repaired. At the same time, the wearing parts such as the grinding roller and the blade should be repaired and replaced. The grinding roller device should be carefully checked before and after use to see if there is any Looseness, whether the grease is added.

Maintenance rules for use of Feldspar Mills

1. In addition to the sliding bearing on the upper end of the spindle, the Feldspar Mill uses rolling bearings, so it must be operated under good lubrication conditions, otherwise the bearing will be damaged and the service life will be shortened. The maintenance method is as follows: the spindle refueling time is once per shift, but it must be noted that when the oil in the oil cup is not lost or the loss is too slow, the oil passage should be cleaned immediately, and then 50# mechanical oil is added. The oil cup position is at the upper end of the main shaft, the main shaft The base bearing and the grinding roller shaft bearing are filled with grease gun 3# lithium-based grease once every time. The analyzer bearing is opened and cleaned once every six months, adding 3# lithium-based grease, and the fan bearing chamber is added with lithium base. grease.

2. It is forbidden to enter the metal block into the machine, otherwise it will damage the grinding roller and the grinding ring, even the center hanger.

3, the feed should be even, can not be ignored. Too much feed will block the air duct, reduce the output, burn the motor easily, and feed too little will also feed the output. Feeding particle size: The hard material is preferably less than 15 mm in diameter, and the soft material can be 20 mm in diameter. It is strictly forbidden to add bulk material to the Feldspar Mill.

4. Air volume adjustment: The air volume control valve located on the air intake pipe of the fan is generally opened to a large position and adjusted according to the fineness and output requirements. The regulating valve located on the exhaust pipe of the exhaust gas outlet can be adjusted to the inlet without dust emission. The air volume is small and the fineness is high. However, it should be noted that the air volume is too small, and the material in the air duct below the Feldspar Mill main unit is easy to precipitate. Please adjust it appropriately.

5, fineness adjustment, according to the size of the material, soft and hard, water content, specific gravity, the processing thickness is also different, the upper analyzer can be adjusted, high speed, high fineness, low speed, low fineness. Increase the fineness, the output will be reduced accordingly, if the fan speed should be debugged if it is not up to the requirement, the user can flexibly master.

6. The scrapping limit of the grinding roller ring of the Feldspar Mill, the remaining small wall thickness shall not be less than 10mm.

7. When parking, first stop feeding, the Feldspar Mill main unit continues to smash, so that the residual abrasive continues to be milled. After about one minute, the main motor and analyzer motor can be turned off to stop the grinding work, and then Stop the fan motor to purge the remaining powder.